Change Status on Structure
Explanation
This activity is used to change the status of an object and its child 
objects within a functional or locational structure, at the same time. The 
change in design status occurs downwards and affects only the object's child 
relations. Parent relations are not affected. The design status cannot be 
changed for a nonexistent structure; in other words, if the structure does not 
exist, the command to change it is ignored. It is not possible to change the 
structure into an invalid status. The Ignore Objects with Invalid Status 
option is available in order to skip any objects in the middle of the structure 
with a different status and continue the changes for the rest. If the status 
change process is time consuming, it is also possible to select to run it as a 
background job. Always review the object's relations and/or the object's class 
relations before changing an entire object structure.
Prerequisites
A structure comprising of child objects, should exist for a selected object.
System Effects
	- The status of the object and child objects is changed to the selected option, 
if the status change is valid for the objects.
	
- All system effects due to the status changes will be applied. 
Window
Design Object
Design Objects
Linear 
Design Objects
Related Window Descriptions
Design Object
Design Objects
Linear Design Objects
Change Status on Structure
Procedure
	- Open the Design Object window 
	or locate the design object in the Business  Object  Explorer if you want to 
	change the 
	structure on a structure for one object. Open the 
	Design Objects or
	Linear Design Objects windows 
	if you want to change the status on the 
	object structure for many objects. 
- Search for the required design object. Select the design object.
- Right-click and click Change Status on Structure. The Change Status on Structure dialog box opens.
- In the Change Object Status to field, select the status to change to, 
	from the list. 
- In the Select Structure to Change group of fields, select either 
	the Functional Structure or Locational Structure 
	check box, depending on the type of 
	object structure required to be changed.
- Select the Ignore Objects with Invalid Status 
	check box to apply the status change on those objects in the structure for 
	which the change is possible and to disregard those for which it is not.
- Select the Run as Background
	Job or Refresh Client check box, depending on if you want to run 
	the status change as a background job, if time consuming, or to refresh the 
	window from which the status change is being performed so that the change will 
	be visible immediately after the operation is complete. 
- Click OK.