Approve Status Change
Explanation
This activity is used to approve a status change of a 
contract change order (CCO). It may be necessary to 
approve in several stages/statuses of the CCO before approval can completed and activated 
later for implementation. An approval per status should be defined first in the 
Contract Change Order/Approvals tab. This approval per status should then 
be approved before the status of the CCO can be changed.
For each approval per status line it is optional to define an approval 
routing in  
Attachments. The steps in this approval routing can be entered 
manually or be retrieved automatically from thechange 
type and the respective 
	approval 
rule in Contract Change Basic 
Data window. To change the status of the approval per status line to 
approved all steps in the approval routing should be approved first.
Prerequisites
  - A CCO should exist.
- An approval per status line should be defined in the 
	the Approvals tab 
	for the CCO. The Change Approval Status field for this approval line 
	should be set 
	to the status you want to approve i.e. Analysis in Progress, Analyzed, 
	Submittal Approved, Approved, Active, Closed or Canceled.
- An approval routing can be connected to the approval line 
	above. This step is optional.
- IFS Document Management should be installed.
- If approval per status lines and/or approval 
	routings should be added automatically to the CCO these should be defined for the the
	change 
	type and the respective 
	approval 
	rule in Contract Change Basic 
Data window.
System Effects
	- The status is changed for the CCO. A history record is created and displayed in the
	Contract Change 
	Order/History tab.
Window
Contract Change Order
Related Window Descriptions
Contract Change Order/Approvals
Contract Change Order/History
Procedure
  - Open the 
	Contract Change Order window and query for the 
	required CCO.
- Click the Approvals tab and select the record to approve.
- Click  Attachments. You will be able to see the 
	available approval routings if an approval routing is connected to the 
	approval record.
- Follow the steps described in the
	
	Approve Approval Step activity to approve all the steps.
- Once all steps have been approved, go back to the approval 
	in the Approvals tab, right-click and then click
	Approve. The status of the CCO header can now be changed by selecting 
	the relevant status in the Status menu option.