Calculate Cost for Part Cost Group
Explanation
Use this activity to calculate costs for all parts connected to the same part cost
group. This
optional but recommended task is to be performed by a system administrator or
equivalent person.
You can calculate costs for several parts at a time. When calculating costs, the costs set up
throughout the system are gathered and
attributed to the correct part. A cost calculation can be performed for a part
cost group. The calculation of all parts is performed as a batch job. The
calculation updates the part's level labor costs and the cumulative costs in the
estimate section of the inventory part register. The structures and operations
of the part are calculated and the costs are rolled up to update the cumulative
calculations of the parent part.
 Note: You cannot perform cost calculation for cost set 1.
Prerequisites
This activity has the following prerequisites:
  - Cost sets must be defined.
- Sites must be defined.
- Inventory parts must be created.
- The cost set for which you are performing the calculation must have costs defined.
- Parts must have been assigned to the selected part cost group.
System Effects
As a result of this activity:
  - The costs for all parts connected to the part cost group all
levels deep will be calculated and the results saves in the selected cost set.
- The calculations are used in the comparison of accumulated (all level)
    costs.
Window
Part Cost Group
All Parts Cost 
Calculation
Related Window Descriptions
Part Cost Group
All Parts Cost Calculation
Procedure
You can perform this activity in the 
All Parts 
Cost Calculation window by either direct execution (Procedure A) or by 
scheduling the task to execute as a background job (Procedure B).
Procedure A: 
 
  - Open the All Parts Cost Calculation 
	window.
- In the Site field, click List and select the site for which 
	you want to perform the cost calculation, from the List of Values.
- In the Cost Set field, click List and select the cost set 
	for which you want to perform the cost calculation, from the List of Values.
- In the Part Group ID field, click List and select the part 
	cost group for which you want to perform the cost calculation, from the List 
	of Values. 
- In the Effective Date field, specify the date when structures and routings should be
    valid.
- In the Stop Roll list, click either Not Stop Cost Rollup or 
	Stop Cost
    Rollup.
- Click OK.
Procedure B: 
Click Schedule, it will open New Database Task Schedule 
window. Set the scheduling parameters as desired and save.
To perform this activity in the 
Part Cost Group 
window, follow these steps: 
  - Open the 
	Part Cost Group  window.
- In the Part Group ID list, query for the part cost group for which you want to perform
    the calculation.
- In the header, right-click and then click All Parts Cost Calculation. The values from the selected part cost group will be shown in the 
	All Part Cost Calculation  window.
- In the Cost Set field, click List and select the cost set 
	for which you want to perform the cost calculation, from the List of Values. 
- Click OK.