Copy Costs to Cost Set One - Selected Parts
Explanation
Use this activity to copy cost sets of selected parts to cost set 1. This 
compulsory task is to be performed by a system administrator or equivalent 
person.
Cost set 1 is used as the standard cost set. You can copy costs from any cost 
set into cost set 1. If the IFS site is defined as using standard costs, then 
cost set 1 can only be updated by performing this activity. Because costs of 
cost set 1 cannot be overwritten, the current costs are moved to a history 
table, where they can be viewed for historical purposes. 
One of the most common mistakes users make when using IFS/Costing is that 
they forget to copy work center, labor, and/or subcontracting costs to a new 
cost set - in this case, cost set 1. You can easily avoid this mistake by 
selecting the Copy Work Center and Labor Class Costs check box and the 
Copy Sub Contracting Costs check box in the 
Copy Cost To Cost Set One 
- Selected Parts dialog box. 
Note: If you select the Copy Work Center and Labor Class Costs 
check box, all costs for work centers and labor classes on the site are copied 
from the selected cost set to cost set 1. And similarly if you select the 
Copy Sub Contracting Costs check box, all subcontracting costs for outside 
operations are copied from the selected cost set to cost set 1.
For supplier delivery overheads defined in the source cost set, in order to 
copy supplier delivery overhead in to destination cost set it is required to 
have the Copy Supplier Delivery Overhead check box selected.
If the Capture Cost Sources check box is selected, the cost sources 
for the cost buckets are captured in the part cost calculation. These cost 
sources will then be included in the shop order estimated calculation and also 
when generating project costs
Note: Only costs connected to structure/routing alternative "*" are 
copied (due to the fact that the inventory valuation logic only handles "*"). 
When you copy part costs to cost set 1 (standard costs), the inventory is 
revalued, and new postings are created.
Prerequisites
This activity has the following prerequisites:
	- More than one part cost record must be selected. The selected records 
	cannot be of the same part.
- Costs for a cost set other than cost set 1 must exist. 
System Effects
As a result of this activity:
	- The inventory value will be modified for parts with inventory valuation 
	method set to Standard Cost and inventory part cost level set to 
	Cost Per Part. If the inventory part has a balance on hand, the system 
	automatically recalculates the inventory value for the part. Posting types
	M8 and M9 are affected, and the inventory value is increased 
	or decreased accordingly.
-  Postings to the accounting systems will be created, since the 
	inventory value is updated. 
- The costs of cost set 1 cannot be overwritten, so the current costs will 
	be moved to a history table. This part cost history can be used to follow up 
	on valid costs throughout history. 
- An entry is added to the 
	Part Cost History window. 
	
- The cost set estimated material cost of cost set 1 for all parts 
	subjected to copying will be replaced with the costs of source cost set. 
	
- Copying costs to cost set 1 will be the only available option to update 
	cost set estimated material cost in cost set 1. 
- If the Update Estimated Material Cost in Inventory Part check box 
	is selected, the estimated material cost of the respective inventory part is 
	updated. 
- The part specific general overheads, material overheads, sales 
	overheads, purchase part delivery overheads and supplier for purchase part 
	delivery overheads defined for the source cost set will be copied in to cost 
	set 1. As a result, corresponding overhead records for the cost set 1 will 
	be created and could be seen in respective clients for such part connected 
	overheads. 
- For supplier delivery overheads, costs will be copied to cost set 1 only 
	if the Copy Supplier Delivery Overhead check box is selected. 
- If the Run in Background check box is selected, the process 
	will run as a background job.
Window
Part Costs
Related Window Descriptions
Copy Cost to Cost Set One - 
Selected Parts
Part Costs
Procedure
	- Populate or query for the required records in the 
	Part Costs window.
- Select the records whose cost sets you wish to copy to cost set 1.
- Right-click and then click Copy Costs to Cost Set One - Selected 
	Parts. A dialog box appears.
- To update estimated material cost of inventory parts, select the 
	Update Estimated Material Cost in Inventory Part check box.
- To copy costs for parts in the underlying structure, select the 
	Include Components check box. 
- To include copying of costs for configurable parts, select the 
	Include Configurable Parts check box.
- To copy work center costs and labor costs, select the Copy Work 
	Center and Labor Class Costs check box. 
- To copy sub contracting costs, select the Sub Contracting Costs 
	check box. 
- To copy supplier delivery overheads, select the Copy Supplier 
	Delivery Overhead check box. 
- To capture the cost sources for the cost buckets in the part cost 
	calculation, select the Capture Cost Sources check box.
- Select the Run in Background check box to run the process as 
	a background job.
- Click OK.