Simulate Routing Cost
Explanation
This activity is used to simulate costs for routing alternates independent of the routing alternate status.
Note: You cannot perform a cost per routing calculation for cost set 1. 
If part has a by-product, cost reductions related to the by-product will not be 
taken into consideration when part routings cost is simulated or viewed.
Prerequisites
This activity has the following prerequisites:
	- Cost sets must have been defined. 
- A manufacturing or prototype routing must have been created.  
System Effects
As a result of this activity:
	- Costs will be calculated for the given routing alternate.  
- Routing cost type cost records will be created for the part routing cost. Only the last simulation for a routing alternate will be saved.  
Window
Part Routing Cost
Related Window Descriptions
Part Routing Cost
Procedure
	- Open the Part Routing Cost window 
	and create a new record. 
- In the Site field, click List and select the site for which you want to perform the cost calculation.  
- In the Part No field, click List and select the part for which the calculation should be performed.   
- In the Cost Set field, click List and select the cost set for which you want to perform the cost calculation.
- In the Routing Rev/Alt field click List and select the routing revision/alternate 
	for which you want to perform the cost simulation. 
- If you want to calculate the cost for a particular lot size, change the automatically fetched lot size in the Std Lot Size field. 
- Save the record.  
- Click Calculate in order to calculate the cost for the given combination of structure and routing.