Add Routing Operation Template
Explanation
This activity will enable you to add the 
operations of a routing template in the project delivery structure along with 
project specific operations. You will also be able to update the operations in 
the project delivery structure with the latest routing template operations that 
may have occurred due to project manufacturing requirements. 
Prerequisites
	- The delivery project should exist.
- The provide code of the project item should be Make.
- A routing template should exist. 
System Effects
	- The Routing Template ID will be added in the Project 
	Product/Item tab.
- The template operations will be copied to the  Project Item 
	Navigator/Project Operations tab.
- If there are any manufacturing routing operations already, they will be 
	replaced with the template operations.
Window
Project
Product/Items
Related Window Descriptions
Project Product/Items
Procedure
	- Open the Project Product window, query 
	for the required project.
- Click the Item tab and select a project 
	item that has Make as the Provide 
	Code.
- Enter a routing template in the Routing Template ID field using 
	the List of Values.
- Save the record.
- Observe that the operations from the routing template will be copied to 
	the Project Item Navigator/Project Operations 
	tab.