Calculate Project Item Rollup Cost/Hours
Explanation
Perform this activity to calculate the rollup cost and 
hours for a 
project item in the project product structure. This can be executed either as an 
Online process or a background job.  
Once you right-click and select the  
Calculate Cost and Hours menu option, 
the result will be stored in the 
Project
Rollup field for the project item and all items in the product structure. 
The components of a standard planned item or a component of a PMRP or DOP item 
will not have cost or hours stored, as the component cost will not be rolled up 
to the Standard Rollup cost of their parent. Parent part will store the cost 
and hours of the complete sub assembly.
Cost and hours for Standard Level and Standard Rollup columns are 
retrieved according to the hierarchy described in the topic
About Project Item 
Cost and Hours.
The cost and hours will also be updated to the Planned 
field of the connected activity with the relevant cost element. 
Prerequisites
  - 
	The project item, with the exception for standard planned parts or parts 
	with supply option PMRP or DOP, must have a structure in the delivery 
	project.
- The currency code to the company's default site (defined in PDMCON_SITE in 
	Product
    Basic Data/Defaults tab) must exist in the currency rate type 
	used for accounting in project. The project specific currency rate
    type for accounting is defined in the 
	Project/Currency tab. 
It is recommended that you perform cost calculations for inventory parts in 
IFS/Costing and doe Engineering parts in IFS/PDM before 
  running the cost calculation in the delivery project.
System Effects
	- The values are calculated for all levels in 
the project product structure, starting from the bottom then upwards
to the top project item. The calculation updates
	the Project Rollup 
	cost and hours for all items in the
structure.
Calculation Rules
  - X1 = Standard Rollup Cost/Hours (from Costing or from PDM
  adjusted to project currency code) 
- X2 = Standard Level Cost/Hours (from Costing or from PDM adjusted to project currency code)
- X3 = Project Level Override Cost/Hours
- X4 = Project Override Cost/Hours
For the bottom level (parts with no sub-parts):
  - Project Roll Up cost and hours are updated to the first existing
  occurrence of X4, X3, X2, X1, 0 (zero).
For all parts with sub-parts:
  - IF X4 has value
 Project Roll Up = X4 (i.e. this will ignore all costs/hours on lower
levels)
- ELSE
 IF it is a standard planned part or part with supply option PMRP or DOP
 Project Roll Up = first existing occurrence of X3, X2, X1, 0 (zero)
 ELSE
 Project Roll Up = Sum of (Project Roll Up value for the child * quantity 
		of the child) for all sub items on the level below + first existing 
		occurrence of X3, X2, 0 (zero)
Window
Project Item Navigator
Related Window Descriptions
Project Item Navigator/Cost
Project Item Navigator/Hours
Procedure
  - Select the project item for which you want to do a rollup cost
	and hours calculation.  
  
- Right-click and then click
	Calculate Cost and 
	Hours.
- In the proceeding dialog box you can execute the calculation Online or 
	as a background job by selecting the Run in Background 
	check box 
	accordingly.