Edit/Remove Operations 
Explanation
The operations during the manufacturing of a 
product, i.e., manufacturing routing operations and template operations as well 
the project specific operations that are attached to the project item, can be 
modified and removed according to your requirement. You can also get the most 
recent set of operations related to the item when you right-click and select the
Update Operations menu option. 
Prerequisites
	- The delivery project should exist.
- The provide code of the project item should be Make.
- A record should exist in the Project Item Navigator/Project 
	Operations tab.
System Effects
	-  The operations record will be changed or deleted from the system. 
	
Window
Project Item Navigator/Project Operations
Related Window Descriptions
Project Item Navigator/Operations
Procedure
	- Open the Project Item Navigator window, 
	query for the required project and select the appropriate item.
- Click the Project Operations tab and 
	modify the required operation line.
- Save the change.
- You can also delete the selected record from the system.