Add CO Lines and Corrective Actions
Connect/Disconnect CO Action and Object
Explanation
Use the 
Change Order/Actions
tab
to register Change Order (CO) lines and actions. A CO can be divided into one or more CO lines, which in
turn can be divided into one or more CO actions. You can register, view, edit, and delete
CO lines and CO actions. You can describe, plan, maintain and follow up on the actions
and steps that must be done to accomplish the change. The upper table is used for
registering information about CO lines, while the lower table is used for registering
information about CO actions.
 Generate Details and Actions automatically generates one Change Order Line
and one Change Order Action for each part connection in the Change Requests listed in the 
Based On tab.
Prerequisites
The CO must have been created.
System Effects
The CO lines and actions can be followed up and analyzed.
Window
Change Order/General
Related Window Descriptions
Change Order/Actions
Procedure
	- Open the Change Order window and query for the CO for which you 
	want to add lines and actions to, and click the 
	Actions
	tab. Alternatively, you can also select the required CO in the 
	Change
Orders window. Right click and select Change Order in the 
	menu, from which you can access the 
	Actions tab.
To enter a CO Line: 
  - Create a new line in the upper table and enter a CO Line number.
- Enter a description of the CO line. The information and responsible fields can be
    entered either now or later.
- Save the new CO line.
To enter a CO Action: 
  - Select a CO Line in the upper table.
- Create a new line in the lower table.
- Enter an Action Number, Description, Progress, and a Cause. You can use 
	the List of Values to select a valid cause.
- Enter planned hours or planned cost as required.
- Save the new action.
- If you want to connect the CO action line to a 
	project activity where it will report cost and hours to the project, you 
	need to connect the planned cost or the planned hours you entered to a 
	project cost element. You can use the List of Values to select an 
	appropriate cost element. 
There are two ways of connecting a CO Action to an object - either via the CO Action or
via the object.
Alternative 1: Connect CO Action and object via the CO Action 
  - Select the CO Action in the lower table and right click to select the Connect Object
	menu option .
- Select the type of object you want to connect in the 
	Object list in the dialog window. The window will be populated with 
	the available objects of the selected type.
- Select the required object.
- Click OK. The CO Action is now connected to the object and is available in 
	Connected Object/Change Actions
    from the object.
Alternative 2: Connecting object and CO Action via the object 
  - Select the object to be connected to the action. For example, to connect an engineering
    part revision to a CO action, populate Engineering Part Revision with the 
	required part.
- Click the Attachments, then select the 
	Change Actions link.
- Insert a new record and select the CO Number, CO Line, and Action Number. 
	You can use the List 
	of Values to select appropriate values.
- Save the changes.
- You can now access the CO directly by clicking on the CO Number field and then
    using the standard zoom functionality (Shift + F9). This will open the 
	Change Order
    window.
There are two ways of disconnecting object and CO Action:
Alternative 1: Disconnect object and CO Action via the CO Action 
  - Select the CO Action in the 
	Change Order/Actions 
	tab.
- Select the right mouse button menu option Remove Object Connection.
Alternative 2: Disconnect object and CO Action via the object 
  - Select the object to be disconnected. For example, to connect an engineering
    part revision to a CO action, populate Engineering Part Revision with the desired part.
- Click the Attachments, then select the 
	Change Actions link.
- Remove the record for the CO you want to disconnect from the object.
- Save.