Create Component Repair Order, Assembly Shop Order
Explanation
Use this activity to create a component repair shop order for an assembly 
shop order component line. Component repair shop order will be created for the 
specified quantity in the New CRO Assistant. The repair shop 
order quantity in the dialog box may be the total, or a lesser amount, of the issued 
quantity on the assembly shop order material allocation line. The quantity 
specified will be unreserved from the assembly shop order component material 
allocation and reserved to the new repair shop order as the manufactured part 
and a component material allocation line. The component repair shop order will 
not have any other material allocations or operations created. If any additional 
material is necessary, they must be manually created. If any operations are 
necessary, they must be manually created. Processing of the component repair 
shop order is normal. Upon receipt of the material on the component repair shop 
order, the material will be reserved back to the assembly shop order material 
allocation line that originated the component repair shop order. Pegging of the 
component repair shop order can be referenced by the Interim Order for the work 
scope.
Prerequisites
An assembly shop order with issued material. 
System Effects
As a result of this activity: 
	- A repair shop order will be created for the material allocation line 
	specified with the component material as the manufactured part.  
	
- A material allocation on the repair shop order will be created for the 
	same material as the component material. 
	
- The assembly shop order material allocation for the component material 
	will have unissued the quantity that is specified to be repaired. This 
	specified quantity will be the lot size for the repair shop order. It will 
	also be the material allocation quantity for the component material 
	allocation. 
	
- The repair shop order will have reserved the repair quantity to the 
	material allocation line. 
	
- The repair shop order is pegged to the Interim Order structure. 
	
- Processing of the component repair shop order is normal. Upon receipt, 
	the material is reserved back to the assembly shop order component material 
	allocation line. 
	
- The component repair shop order will be closed automatically with the 
	reset of the MRO shop orders in the work scope. 
Window
MRO Shop Order
Related Window Descriptions
MRO Shop Order
MRO Shop Order/Material
Procedure
	- Open the 
	MRO Shop Order window. 
	
- Select the 
	Material tab and select the desired component. 
	
- Right-click and then click Create Component Repair Order. The 
	
	Create Ad Hoc Repaired Shop Order dialog box will appear, inquiring 
	the quantity you want to repair for the material allocation line. 
	
- Click Yes. The dialog box will create a new repair shop order with 
	reserved component material.