Change CAMRO Interim Order Dates
Explanation
Use this activity to manually change the
start and supply dates of any type of maintenance, repair and overhaul (MRO) interim order.
Prerequisites
The interim order cannot be in a Canceled or Closed state. 
System Effects
N/A
Window
CAMRO Interim Order Structure
Related Window Descriptions
CAMRO Interim Order Structure
Procedure
  - From the Interim Header ID list, select the interim order structure
    that contains the interim order for which you want to change the dates.
- Open the 
Tree Structure tab and select the
  appropriate interim order. Verify that the state of this interim order is not Canceled or Closed.
  
- Click the 
	Detail tab in the 
	Tree Structure tab and 
change the start or supply dates as needed. 
  
- Save the record.