Evaluate CAMRO Interim Order Costs
Explanation
Use this activity to examine
the cost information for an MRO interim order. You can view
information such as the estimated as well 
as the actual level and accumulated costs. Level costs refer to the cost
specific to the interim order selected, whereas accumulated costs refer to the 
costs accumulated through all the interim orders up to the level of the interim 
order selected. Currently accumulated costs for disassembly 
structures are also accumulated bottom up.
Prerequisites
N/A
System Effects
N/A
Window
CAMRO Interim Order Structure
Related Window Descriptions
CAMRO Interim Order Structure
Procedure
  - 
From the Interim Header ID list, select the interim order structure
that contains the interim order with the costs you want to evaluate.
  
- Open the 
	Tree Structure tab.
- Click the 
	Disassembly
    or 
	Assembly tab, as appropriate.
- Click the 
	Costs  tab to
    examine the details relating to the level and accumulated costs incurred for
    the interim order.