Release Current CAMRO Interim Order
Explanation
Use this activity to release a specific MRO 
interim order on any level in the order structure.
Prerequisites
The interim 
order being released must be be in a Created or Changed state. In 
addition, the parent of this interim order in the order structure should be in a
Released state.
System Effects
N/A
Window
CAMRO Interim Order Structure
Related Window Descriptions
CAMRO Interim Order Structure
Procedure
  - 
From the Interim Header ID list, select the interim order structure
that contains the interim order to release.
  
- 
Open the 
Tree Structure tab and select the interim order to release. 
  
- 
Verify that the state of this interim order is Created or Changed. Verify also that the 
parent of this interim order is in a Released state.
  
- 
Right-click in the 
Tree Structure 
tab and then click  Release to release the interim 
order. This will create an MRO shop order for the type of interim order being
released (either a disassembly, disposition, repair, or assembly MRO shop
order). 
If the state of the interim 
order is Changed, the shop order connected to the interim order is revised 
accordingly.