Manually Reschedule the Work Order Structure
Explanation
This activity is used to manually reschedule the work orders in a work order 
structure.
Prerequisites
To perform this activity, the work order structure must exist.
System Effects
As a result of this activity, work orders and work order operations are 
rescheduled.
Window
Work 
Order Execution Logic
Related Window Descriptions
Work Order Execution Logic 
Work Order Execution Logic/Gantt
Procedure
	- Open the Work Order Execution Logic window.
- Populate (F2) or query (F3) for the necessary work order number.
- Click the Gantt tab.
- Manually move the operations and work orders to the point in time where 
	the work should be executed.
- Save the information (F12).