Enter Project Accounting Pre-posting Information
Explanation
Use this activity to enter pre-posting information for 
a project.
Prerequisites
In order to perform this activity, the following must 
have been completed.
	- 
	The code parts must have been entered. This is done in 
	the Define Code String window in IFS/Accounting Rules. 
- 
	The posting control information must have been entered 
	in the 
	Posting Control 
	 window in IFS/Accounting 
	Rules. 
System Effects
As a result of this activity, the pre-posting 
information can be used when transactions are created by the system.
Window
Project
Related Window Descriptions
Project  
Procedure
	- Open the 
	Preposting tab in the 
	Project window. 
- The default value is displayed for the code part that is used for projects. Enter information for other code 
	parts if necessary and save the entries.