Specify Accounting Structure
Explanation
Use this activity to specify an accounting structure. The structure is used 
for a hierarchical summation of balances in queries and reports. The structure 
is based on one of the code parts B-J.
Prerequisites
Before the structure can be specified, the following must have been completed: 
  - The code part values that are to be used in the structure must have been entered. The
    code part values are entered in 
	Code Part 
	Values 
	in IFS/Accounting
    Rules.
System Effects
As a result of this activity, the structure can be used in query windows in 
IFS/General Ledger. The structure can also be used as a selection criteria in IFS/Report
Generator and in IFS/Periodical Cost Allocation. 
Window
Accounting 
Structure
Related Window Descriptions
Accounting Structure
Procedure
	- Open 
	Accounting Structure. 
- Use the New function and enter the Structure ID, Description,
	Code Part and Code Part Name.
- Click Save. 
- Right click and click New Structure Node to create a new node for 
	the structure and enter the Node id and Node Description.
- Right click and click Change Parent Node to change the parent 
	node.
- Right click and click Create New Top Node if you want to create a 
	new node for the top level. Note: Once the top level node has been created 
	it cannot be deleted. 
- Right click and click Set Level ID and Description. The 
	level Id is automatically defined sequentially for the subsequent levels but 
	you can change the description and id type as required. 
- Drag a code part value(s) from Not Used Code Part Values folder 
	to the node(s) linked to a level as required. Alternatively, right-click and 
	then click Multi Insert to open the 
	Insert Values
	window and select the code part values to be inserted. (Similarly, you 
	can right-click and click Multi Remove to remove existing code part 
	values)
- Right click to change the Structure Status. You can select any 
	one of the following options i.e. Set Status to Active to activate 
	the structure, Set Status In Progress if it is in progress or select 
	Set Status Obsolete if the structure is no longer in use.
 Note: By default the structure status that appears is In Progress.