Review Planned Work
Explanation
This activity is used to view the defined work scope. This can be done on the 
maintenance order or in the work order execution logic structure. The work load 
can be reviewed to make sure that it will be possible to perform the work within 
the allocated time and with the available resources.
Prerequisites
To perform this activity, a maintenance order must have been created and 
released.
System Effects
As a result of this activity, the defined work scope is reviewed.
Window
Maintenance Order
Work 
Order Execution Logic
Related Window Descriptions
Maintenance Order 
Maintenance Order/Maint. Order Str.
Maintenance Order/Included Tasks
Maintenance Order/Exec. Logic
Work Order Execution Logic
Work Order Execution Logic/Gantt
Procedure
Use the following procedure to view a maintenance order:
	- Open the Maintenance Order window and query (F3) for 
	the necessary 
	maintenance order. 
- The tasks included on the maintenance order can be viewed in the 
	structure navigator displayed in the Maint. Order Str. tab or 
	on the Included Tasks tab.
- If the Execution Logic Structure distribution type is used, click 
	the Exec. Logic tab and then click the 
	Gantt sub 
	tab. To view the entire execution logic structure in the Gantt chart, select 
	the topmost node in the execution logic structure which is found to the 
	left of the tab.
Use the following procedure to view a work order execution logic structure:
	- Open the Work Order Execution Logic 
	window and query (F3) for the necessary work order.
- View the structure of the work order in the work order structure displayed 
to the left of the window or you can click the Gantt 
tab to view the structure in a Gantt chart.