Create Planning Structure
Explanation
Use this activity to manually enter the structure of a part, i.e., the components
comprising the parent part. The planning structures represent structures of product
families used by two-level master scheduling.
Prerequisites
This activity requires that the parent part and the components must have been defined
in the Inventory Part window and the parent part must have a planning method of either O or
T. 
System Effects
As a result of this activity, the system connects components to a parent part.
Window
Planning Structure
Related Window Descriptions
Planning Structure
Planning Structure/Planning Structure
Procedure
  - Display the parent part by populating or by making a selective query.
- Mark the first empty line in the 
	Planning Structure tab.
    Create a new record (F5).
- Select the component site in the  Component Site  column. Click List of Values
    to
    select from available sites.
- Select the component part in the  Component Part  column. Click List of Values
    to
    select from available parts.
- In the  Quantity per Assembly  column, enter the quantity of the component to go into one
    of the parent parts.
- Repeat steps 3-5 for each component.
- Save the record (F12).