Define Condition Measurements for Instructions 
Explanation
This activity is used to define the condition 
measurements that are to be performed when executing an instruction (operation) 
on a work order. 
Prerequisites
	- An instruction must have been defined.
- A condition monitoring program for the part 
	revision of the instruction must have been defined.
System Effects
As a result of this activity, the condition categories 
to be measured when the instruction (operation) is executed on a work order are defined.
Window
Instruction  
Related Window Descriptions
Instruction  
Instruction/Cond Meas. 
Procedure
	- Open the Instruction window and 
	query (F3) for the necessary instruction (operation).
- Click the Cond Meas. tab and create 
	a new record (F5).
- A value in the Part Number field appears 
	automatically. If necessary, use the List of Values to select another part 
	number.
- In the Part Revision field, enter or verify 
	that you have the correct revision of the part. Use the List of Values to 
	select a valid value.
- In the Condition Category field, enter the 
	condition category to measure. Use the List of Values to select a valid 
	value.
- In the Condition Code field, enter the 
	condition code to measure. Use the List of Values to select a valid value.
- Save the information (F12).