View Instruction Journal
Explanation
This activity is used to view journal entries for an instruction. A journal 
entry is generated automatically when the following actions are performed on an 
instruction:
	- The instruction is activated.
- The execution phase, function number, competence, and location are 
	changed on an active instruction.
- Material, tools/facilities, zones and access panels, sign off 
	requirements, criticality, condition measurements, and subtasks are 
	connected to or removed from the active instruction.
- The active instruction is connected to or removed from a task code, on 
	all task types.
- The instruction is made obsolete.
Prerequisites
To perform this activity, journal entries must have been generated for the 
instruction.
System Effects
As a result of this activity, the changes made on an instruction can be 
tracked.
Window
Instruction
Related Window Descriptions
Instruction 
Instruction/Journal
Procedure
	- Open the Instruction window and search 
	for the relevant instruction.
- Click the Journal tab and observe the journal entries 
	that are generated for the 
	instruction.