Manage Warehouse Tasks Planning
Explanation
This activity is used to manage and plan a warehouse task by using 
multiple filtrations and also to assign or reassign a worker 
or a worker group. 
It is also possible for the planner to look at the current and future work 
load and resource availability balance, as well as ways of making quick changes 
to the system in order to regain a convenient work load or resource availability 
balance. This includes both very radical mass changes and small ad hoc changes 
to both basic data and the current set of open warehouse tasks.        
The manager can prioritize the 
warehouse tasks as he wish by setting an operative priority.
Prerequisites
  - The warehouse workers and worker groups must have been entered with the correct
    setup of task types, location groups, and efficiency rates in  
	Warehouse Task Basic Data/Warehouse Worker tab.
- Warehouse tasks for the current site must not have been generated,
    closed, or canceled.
- Stock should not be frozen for counting.
System Effects
As a result of this activity:
	- Desired information will be retrieved as per 
	selected filter criteria.
- A warehouse worker or worker group will be assigned or re-assigned.
- If the planner makes any changes to the warehouse work or to the
warehouse task, this will affect the work load in some way. He might change the time that
a worker spends on a specific task type so that the available resources increase for this
task type. He could change the requested date finished for a task in order to re-plan it in
time. 
- The changes that affect the work load or resource situation are
displayed in Workload per Location Group or in 
	Workload per 
	Location Group Graph.
Window
Warehouse Manager Task Planning
Assign/Reassign Worker
Assign/Reassign Worker Group
Warehouse
Tasks
Workload per 
Location Group Graph
Workload per 
Location Group
Related Window Descriptions
Warehouse Manager Task Planning
Assign/Reassign 
Worker
Assign/Reassign 
Worker Group
Warehouse Tasks
Workload per Location 
Group Graph
Workload per Location Group
Procedure
	- Open the Warehouse Manager Task Planning 
	window.
- Populate or query for the required site in the 
	Site field.
- If you need to filter the required data for the 
	site use the options in the Task Type Parameters area and the
	Assignment area and click Retrieve. If you select the 
	Assigned option in the Assignment area, the Worker ID 
	and Worker Group fields will be enabled and you can enter the required ID of the worker
	or the worker group. If 
	you wish to filter by the location group, enter the required location group 
	using the List of Values in the Location Group filed in the header 
	area and then click Retrieve.
- If you need to change the status of a retrieved 
	tasks: Select the required task ID, right click and then click either 
	Plan, Release, Start, Complete, Park 
	or Restart options according to your 
	requirement.
- If you need more information about a warehouse 
	task, right-click and then click Warehouse Task option.
- If you need to prioritize a warehouse task, you 
	can select the required warehouse task(s), right-click and then click 
	Prioritize option. 
- If you need to assign or reassign a worker group to a 
	specific task, select the required task(s), right-click and then click 
	Assign/Reassign Worker Group option.
- If you need to assign or reassign a worker to a 
	specific task, select the required task(s), right-click and then click 
	Assign/Reassign Worker option. 
If you want to see the current work load and resource 
situation: 
  - Open the Workload per Location Group or
    the
    Workload per Location Group Graph   window you want to see the information
    graphically.
- Select the site, warehouse task type, and location group that you
    want to see in the upper part of the window. In the lower part of the window, you will now
    see the tasks that are waiting to be executed, together with the work resources.
If you want to change the status of the warehouse task: 
  - Open the  Warehouse Tasks
	window.
- Select the warehouse tasks that you want to change 
	the status, right-click and then click the required status.
- Save the record.