Create Labor Resources
Explanation
Use this activity to define a new labor class and its resources.
Prerequisites
This activity has the following prerequisites: 
  - A site to which you can connect the labor class must exist.
- If you want to use a calendar for the labor class other than the site calendar,
that calendar must be defined before you create the labor class.
System Effects
The system creates a new labor class and a labor class resource having the same name as
the labor class.
Window
Manufacturing Labor Class
Related Window Descriptions
Manufacturing Labor Class
Procedure
  - In the 
	Manufacturing Labor Class window, create a 
  new record.
  
- Enter the labor class name in the Labor Class field, using
    up to ten alphanumeric characters.
- Enter a description for this labor class in the Description field.
- Specify the site at which this labor class will used in the Site field. Use 
  the List of
    Values to select from available sites.
- Specify the type of time reporting in the Time Reporting field. 
- If you do not want to use the site calendar that appears by default, specify a calendar
    for this labor class in the Calendar ID field. Use the List of Values to select from
    available calendars. 
- Specify whether the type of schedule capacity used by this labor class is finite or
    infinite in the Sched Capacity field.
- Specify the cost center ID for this labor class. Use the List of Values to select
    from available cost center IDs. 
- Save the record to save this labor class. The system automatically creates a labor
    class resource with the same name as this labor class. 
- If desired, enter additional labor class resources in the 
	Resources
    tab. Each labor class resource must have a unique name and a description. You also
    must specify the Start and End Date availability range for each labor class resource.