Discard Resource Breaks
Explanation
This activity is used to discard a resource break which is in Proposed 
state. The status of the break changes to Finished. A resource break in
Finished state has no effect on the shop order schedule. Resource breaks are taken into account 
only 
when the orders are scheduled using Constraint 
Based Scheduling (CBS), not when using the Shop Order Infinite Scheduler. 
Prerequisites
A resource break with Proposed status must exist.
System Effects
As a result of this activity:
	- the status of the break changes from Proposed
	to
Finished.
- if the break belongs to a CBS site, 
	it will be removed from the Scheduling Server.
- if the break belongs to an Advanced Planning Board (APB) site, it will not be loaded when the APB 
	is used.
Window
Resource Break
Related Window Descriptions
Resource Break
Resource Breaks
Procedure
  - Populate the window.
- Select the resource break(s) you want to discard.
- Right-click and then click  
	Discard. 
	The status of the selected break(s) changes to
	Finished.