Reschedule Operations Automatically
Explanation
Use this activity to reschedule all operations for a site. 
Prerequisites
This activity requires that scheduled operations exist. It also requires a site
connected to a Scheduling Server.
System Effects
As a result of this activity the system reschedules any operations that fall within
your specified criteria.
Window
Schedule Operations
Related Window Descriptions
Schedule Operations
Procedure
  - In the  Site field, choose the site for which to reschedule operations. Use 
  List
    to select from available sites.
- In the Dispatch Rule list, choose a dispatch rule to specify 
	how the scheduling logic should sort orders before scheduling
    begins. If you do not want to use a dispatch rule, use the default value 
  None.
- Select the Set Scheduling Start Time 
   (Hrs from now) 
    check box, then specify the global start time for rescheduling the operations.
  
  
- To specify how you want the Scheduling Server to organize the orders, select one or more
    of the remaining check boxes:
      - Select Reassign Resources if you want the
        Scheduling Server to allow operations to change resources.
- Select As Late as Possible if you want the
        Scheduling Server to place the orders as close as possible to their given need date.
- Select Include Released Orders if you want the
        Scheduling Server to reschedule shop orders with the status Released as well as those with
        the status Planned.
- Select Compress Downstream from Bottleneck
         if you
        want the Scheduling Server to try to keep the operations of any given shop order as close
        as possible to the bottleneck resource.
- Select Refresh Materials if you want the system to update the 
		Scheduling Server with the current material availability profile for the 
		site.
- Select Refresh Project Information if you want the 
      system to update the Scheduling Server with project and project activity 
		related information for the site. 
        
 
- Click 
	OK.