Change Work Center
Explanation
Use this activity to re-plan the operation to another work center.
Prerequisites
An active, internal work center must exist on the same site. 
System Effects
As a result of this activity the operation is rescheduled on the new work 
center.
Window
Shop Floor Workbench
Related Window Descriptions
Change Work Center
Procedure
	- Open the Shop Floor Workbench window. If Reporting Mode 
	has been set to Employee Reporting on the used site an employee or 
	team must have been entered in the Enter As dialog box.
- Click Refresh. The operations will be displayed according to the filter 
	that is being used. 
- Select the operation line for which you want to change the work center 
	and click the Change WC option, or right-click and select the 
	corresponding option.
- In the New Work Center field, use List of Values to select the 
	work center on which you plan to execute the operation.
- Click OK.