Inspection Sign Off
Explanation
Use this activity to perform an inspection sign off for an operation subtask. 
This is compulsory in order to close a shop order where the Inspection Sign 
Off field has been set to Required. This procedure is normally performed by 
an inspector.
This activity contains a Security Checkpoint which can be activated by an 
administrator. With an activated security checkpoint on a function you will have 
to authenticate yourself again in order to fulfill the function. Additionally, 
whenever a security checkpoint is successfully passed a security checkpoint log 
is written, creating an audit trail of what is done.
Prerequisites
	- A work guideline of type Subtask must have been connected to the 
	operation in the 
	Shop Order Operation Work Guidelines window.
- If the Sign Off Required has been set to Required the subtask must have been signed off.
- The operation must not be in status Planned.
- The shop order must not be in status Planned, Parked or 
	Closed.
System Effects
The subtask will be inspection signed off using the current User ID and 
date/time.
Window
Shop Order 
Operation Work Guidelines
Shop Floor 
Workbench
Related Window Descriptions
Shop Order Operation Work Guidelines
Shop Floor Workbench/ Mtrl Guidelines
Subtask
Procedure
From the 
Shop Order/Operation tab, 
Shop Order Operations 
Reporting/Operations tab and 
Work Center Operations 
Reporting/Operations tab:
	- Select the operation line, right-click and then click Work Guidelines.
- Select the subtask you wish to sign off. Right-click and then click 
	Inspection Sign Off.
 
 Note: If you need to revoke the inspection sign off, right-click on the relevant subtask and 
then click Revoke Inspection Sign Off.
From the Shop Floor Workbench window:
	- Select the required operation line and click Subtask. The Subtask dialog box opens. 
- On the Subtask dialog box, select the subtask on which you need to perform an inspection sign off.  
- Click Inspection Sign Off.
- Click Close to close the Subtask dialog box.
 
 Note: If you need to revoke the inspection sign off, select the subtask, click 
	Revoke Inspection Sign Off and then click Close.
From the Shop Floor Workbench/Mtrl Guidelines tab:
	- Select the appropriate operation.
- In the Mtrl Guidelines tab, select the subtask you wish to sign 
	off. Right-click and then click Inspection Sign Off.
 
 Note: If you need to revoke the inspection sign off, right-click on the relevant subtask and 
then click Revoke Inspection Sign Off.