Replace Structure Component
Explanation
This activity is 
used 
to replace a component of a multilevel structure during the multilevel repair 
process. It is also used to change the quantity of an existing 
component.
Prerequisites
- Multilevel repair 
shop order should exist with the parent part in Reserved or Issued state. 
- At 
least one component should exist in the original as-built structure for the 
required parent part.
System Effects
As a result of 
this activity, the changes done to the component gets written in the repair 
history. The number of components marked as to be removed will be listed in the Shop Order/Salvage part tab. Replaced component 
details are added to the
Shop order/Material 
tab. When receiving the repair shop order, a new as-built structure is created 
with the changes done. 
Window
Shop Order
Related Window 
Descriptions
Component Replacement Details
Procedure 
	- 
	
	Open the 
	Shop Order window and query for your multilevel repair shop order.
- 
	
	Make sure that the state of the parent material line is Reserved or
	Issued.
- 
	
	Open the 
	Multilevel Repair Structure 
	tab.
- 
	
	Select the top part from the graphical tree structure, right-click and then 
	click Expand Descendents.
- 
	
	Select the revision node of the parent part where you want to replace the 
	component.
- 
	
	Right-click and then click Component Replacement to open the 
	Component 
	Replacement Details dialog box with the parent part you selected in the header 
	as the parent part.
- 
	
	Select the record from the lower table and change the value to Replace in 
	the 
	Repair Action list. This action will copy the original component data to 
	replacement data.
- 
	
	Enter the new part number in the Replacement Part No field from the 
	List of Values.
- 
	
	Enter the required component quantity either in the Replace Quantity or 
	Replace QPA field. Here you can see the suggested component quantity in 
	the 
	
	Calculated 
	Component Quantity field. 
- 
	Enter the component quantity to be removed in the 
	Comp Qty to be Removed field.
- 
	
	Enter the repair reason for the structure changes by using the List 
	of Values. 
- 
	Click
	Apply or OK.