Report Point Receipt
 
Explanation
 
This activity is used to report production that was performed at a defined report point.
You cannot report more production than was reported at a previous report point, i.e., quantities must be reported through each report point defined.  
If the parent part comprises of one or more catch unit 
(CU) enabled component parts, you must first reserve the catch unit enabled 
components. 
Note: Labor and operation setup time for each receipt is calculated as;
 
[(setup time/standard lot size)*receipt quantity]
If standard lot size is not defined, then the total setup time will be reported for every receipt. 
 
Prerequisites
 
This activity requires that the production schedule exists. A part must be associated
with a production line. Report points must be defined for the production line.   
 
System Effects
 
As a result of this activity, the system backflushes the components and operations used
up to a defined report point. The report point balance is updated for the specific report
point. If a routing is defined, all operation steps falling between this report point and
the previous one are backflushed at standard cost. Operation-linked components used by the
reported operations are backflushed. Material not linked to operations is assumed to be
required at the start of the production. Thus, it is backflushed at the first report
point. If inbound locations are defined, they are used by backflush in its search
hierarchy. If an alternate component substitution sequence is defined, it is used by
backflush when issuing material. Inventory transactions are created
for all issued components. Operations history transactions are written for any backflushed
machine or labor operations. 
 
Window
 
Report Point Receipt
 
Production Schedule by Line
 
Production Schedule by Line Part
 
Related Window Descriptions
 
Report Point Receipt 
Production Schedule by Line 
Production Schedule by Line Part 
Production Receipt
 
Procedure
 
From the Report Point Receipt window: 
 
  - Open the Report Point Receipt window.
	
- In the Production Line list, select the production line and part for which
    to report production.
- In the Structure 
  area, specify either the
    structure/routing revision, or the structure/routing alternate.
- In the Backflush list, specify whether the backflush process should be run
    immediately or deferred.
- In the Qty Reported field, type the quantity to report at the specific report point.
    You cannot report more quantities than are reported in a previous report point.
- Save.
From the Production Schedule by Line window: 
 
  - Open the Production Schedule by Line 
	window. 
- In the Production Line list, select the production line for which to report
    production.
- Select the production schedule line for which to report production. 
  Right-click and then click
    Production Receipt. The Production Receipt 
	dialog box will
    appear.
- In the Production Receipt 
	dialog box, specify how many parts to report and
    receive into inventory in the Qty Reported field. The scheduled quantity is the default
    value.
- In the Backflush list, specify whether the backflush process should be run
    immediately or deferred.
- In the Structure 
  area, specify either the
    structure/routing revision, or the structure/routing alternate.
- In the Location area, select the 
	 Report Point check box to create
    a report point receipt.
- In the  Location area, specify the report point in the 
	Report Point field.
    Click    
  List to select from available report points.
- Click OK.
From the Production Schedule by Line Part window: 
 
  - Open the Production Schedule by Line Part 
	window. 
- In the  Part No list, select the part for which to report production.
- Select the production schedule line for which to report production. 
  Right-click and then click
    Production Receipt. The 
	Production Receipt dialog box will
    appear.
- In  the Production Receipt 
	dialog box, specify how many parts to report and
    receive into inventory in the Qty Reported field. The scheduled quantity is the default
    value.
- In the Backflush list, specify whether the backflush process should be run
    immediately or deferred.
- In the  Structure area, specify either the
    structure/routing revision, or the structure/routing alternate.
- In the Location area, select the 
	Report Point
    check box to create a report point receipt.
- In the Location area, specify the report point in the 
	Report
    Point field. Click  List to select from available report points.
- Click OK.