Report Point Scrap with Edit Components
Explanation
Use this activity to declare report point scrap with edit components on the produced
parts that occurred during the manufacturing process. This allows you to modify a copy of
the product structure to include component substitutions or variations. You can
also create manual assignments for a given structural component for specific locations,
lot/batches, deviation numbers, etc. These are issued when the backflush occurs.
Prerequisites
	- This activity requires that a production schedule exists. 
- Report points must be defined
for the production line. 
System Effects
	- As a result of this activity, the system reports scrap for the parent part. 
	
- Then, it
runs the backflush process to consume the components used up to a defined report point.
The user specifies whether the backflush process is run directly or in the background.
- The
report point balance is not updated for the specific report point when scrapping. 
	
- If a
routing is defined, all operation steps falling between this report point and the previous
one are scrapped at standard cost. 
- Operation-linked components used by the reported
operations are scrapped. 
- Material not linked to operations is assumed to be required at
the start of production. Thus, it is backflushed at the first report point. Inventory
transactions are created for the receipt, as well as all issued components. Operation
history transactions are created for any backflushed machine or labor operations. 
	
Window
Report
Point Receipt
Production
Receipt 
Production
Schedule by Line 
Production Schedule
by Line Part
Related Window Descriptions
Report Point Receipt
Production Receipt
Production Schedule by Line
Production Schedule by Line Part
Scrap Receipt
Production Receipt Material
Production Receipt Reservation
Procedure
From the Report Point Receipt/Production Receipt window:
  - Open the Report Point Receipt/Production Receipt window.
	
- In the Production Line list, 
    select the production line and part for which to report scrap. Right-click 
    and then click Scrap Receipt. The 
	Scrap
    Receipt dialog box will appear.
- In the 
	Scrap Receipt dialog box, select  
	Immediate Backflush
    or  Defer Backflush in the 
	Backflush list.
- In the  
	Structure area, specify the structure revision and
    structure alternate. If desired, also specify the routing revision and the routing
    alternate.
- In the  Production Scrap area, type the quantity scrapped in the 
	Qty
    Scrapped field. Click in the Scrap Reasons field, then click 
	List to select from
    available scrap reasons. If the part is catch unit 
	enabled, enter the quantity to be scrapped in the Catch Qty Scrapped field. 
    
- In the Report Point 
  area, select the 
	 Partial Scrap check box to
    declare a partial scrap at a report point. 
- In the Report Point 
  area, specify the report point in the 
	Report
    Point ID field. Click  
	List to select from available report points.
- To edit components, click 
	Components. The 
	Production Receipt
    Material dialog box will appear.
- In the 
	Production Receipt Material dialog box, type a value in the
    Qty To Issue field.
- To change components, click 
	New. The cursor appears in the
    Part To Issue field. Click 
	List to select from available parts. Next, type a
    value in the Qty To Issue field. 
- Save.
- To reserve the components before backflushing, select the components, then click 
  Assign.
    The 
	Production Receipt Reservation dialog box will appear.
- In the 
	Production Receipt Reservation dialog box, click 
	Create.
    The 
	Inventory Part Location dialog box will appear. 
- In the 
	Inventory Part Location dialog box, select a location.
    Click OK.
- In the 
	Production Receipt Reservation dialog box, type a value in
    the Qty Assigned field. Save.
- When you are finished editing and reserving components, click 
	OK to run the
    backflush.
From the 
Production Schedule by Line window:
  - Open the 
	Production Schedule by Line 
	window. 
- In the  
	Production Line list, select the production line for which to report
    scrap.
- Select the production schedule for which to report scrap. Right-click and then 
  click Scrap
    Receipt. The 
	Scrap Receipt dialog box will appear.
- In the 
	Scrap Receipt dialog box, select  
	Immediate Backflush
    or Defer Backflush in the 
	Backflush list.
- In the 
	Structure area, specify the structure revision and
    structure alternate. If desired, also specify the routing revision and the routing
    alternate.
- In the  Production Scrap area, type the quantity scrapped in the 
	Qty
    Scrapped field. Click in the Scrap Reasons field, then click 
	List 
	to select from available scrap reasons. If the part is
    catch unit enabled, enter the quantity to be scrapped in the Catch Qty 
	Scrapped field.
    
- In the Report Point 
  area, select the 
	 Partial Scrap check box to
    declare a partial scrap at a report point. 
- In the 
	Report Point area, specify the report point in the 
	Report
    Point ID field. Click 
	List to select from available report points.
- To edit components, click 
	Components. The 
	Production Receipt
    Material dialog box will appear.
- In the 
	Production Receipt Material dialog box, type a value in the
    Qty To Issue field.
- To change components, click 
	New. The cursor appears in the
    Part To Issue field. Click  
	List 
	to select from available parts. Next, type a
    value in the Qty To Issue field. 
- Save.
- To reserve the components before backflushing, select the components, then click 
	Assign.
    The 
	Production Receipt Reservation dialog box will appear.
- In the 
	Production Receipt Reservation dialog box, click 
	Create.
    The 
	Inventory Part Location dialog box will appear. 
- In the 
	Inventory Part Location dialog box, select a location.
    Click OK.
- In the 
	Production Receipt Reservation dialog box, type a value in
    the Qty Assigned field. Save.
- When you are finished editing and reserving components, click 
	OK to run the
    backflush.
From the 
Production Schedule by Line Part window:
  - Open the 
	Production Schedule by Line Part 
	window. 
- In the Part No list, select the part for which to report scrap.
- Select the production schedule for which to report scrap. Right-click and 
  then click Scrap
    Receipt. The 
	Scrap Receipt dialog box will appear.
- In the 
	Scrap Receipt dialog box, select 
	Immediate Backflush
    or Defer Backflush in the 
	Backflush list.
- In the Structure 
  area, specify the structure revision and
    structure alternate. If desired, also specify the routing revision and the routing
    alternate.
- In the Production Scrap 
  area, type the quantity scrapped in the 
	Qty
    Scrapped field. Click in the Scrap Reasons field, then click 
	List to select from
    available scrap reasons. If the part is catch unit 
	enabled, enter the quantity to be scrapped in the Catch Qty Scrapped field.
    
- In the  
	Report Point area, select the 
	 Partial Scrap check box to
    declare a partial scrap at a report point. 
- In the Report Point 
  area, specify the report point in the 
	Report
    Point ID field. Click  
	List to select from available report points.
- To edit components, click 
	Components. The 
	Production Receipt
    Material dialog box will appear.
- In the 
	Production Receipt Material dialog box, type a value in the
    Qty To Issue field.
- To change components, click 
	New. The cursor appears in the
    Part To Issue field. Click 
	List to select from available parts. Next, type a
    value in the Qty To Issue field. 
- Save.
- To reserve the components before backflushing, select the components, then click 
	Assign.
    The 
	Production Receipt Reservation dialog box will appear.
- In the 
	Production Receipt Reservation dialog box, click 
	Create. The 
	Inventory Part Location 
	dialog box will appear. 
- In the 
	Inventory Part Location dialog box, select a location.
    Click OK.
- In the 
	Production Receipt Reservation dialog box, type a value in
    the Qty Assigned field. Save.
- When you are finished with editing and reserving components, click 
	OK to run
    the backflush.