Schedule Shop Order(s)
Explanation
This activity is used to calculate the start and finish date of the operations 
and the shop order, according to the schedule direction.
 Efficiency, utilization, maximum hours of operations as well as queue time, transport time 
and so on have been taken into account when 
 scheduling the shop order. If the corresponding site is CBS server enabled, then it will be used to schedule the shop order.  
Prerequisites
N/A
System Effects
As a result of this activity:
	- The shop order(s) will be (re)scheduled with the new 
	start and finish dates based on the infinite scheduling or the CBS server 
	logic. If Schedule Direction is 
	set to Forward Scheduling 
	the order will be scheduled from its 
	Earliest Start Date 
	and forward. If Schedule 
	Direction is set to
	Backwards Scheduling 
	the order will be scheduled backwards from its 
	Need Date.
- Manual scheduling changes done 
	to the operations of the order will be overwritten.
- Operation scheduling done by
	IFS/Advanced Planning 
	Board will be 
	overwritten.
Window
Shop Order
 
Shop Orders 
Disposition 
Shop Order
Related Window Description
Schedule Shop Order(s)
Shop Order
Shop Orders 
Disposition Shop Order 
Select Visualization
Related Visualization Chart Descriptions
Machine Load Summary
Machine Load In Standard Hours
Machine Operation Load In Standard Hours
Machine Load
Shop Order Machine Load
Shop Order Labor Load
Shop Orders Material Availability
Shop Orders Material Availability Summary
Procedure
To schedule shop orders using the 
data view from
Shop Order
 
	or Disposition Shop Order window:  
	- Open the
Shop Order
	 
	or Disposition Shop Order window and search for the 
	order to schedule.
- Right-click and then click Schedule Shop Order. 
	
To schedule shop orders using the 
data view from
Shop Orders window:  
	- Open the
Shop Orders 
	windowand search for the order(s) to schedule.
- Right-click and then click Schedule Shop Order. 
	
- Select Schedule Using Existing Shop Order 
	Settings if you want to base the scheduling on the existing Schedule 
	Direction, Earliest Start Date and Need Date of the shop 
	order(s).
- Select Forward Schedule From Earliest Start 
	Date and specify an earliest start date if you want to change 
	Schedule Direction to Forward Scheduling and schedule the shop 
	order(s) from this date.
- Click OK.
To schedule shop orders using the 
visualization view: 
	
	- Open a visualizer enabled window 
	and query for your site.
- If the Data View is displayed, click Visualization View on the title bar. 
- Right-click and click Select Visualization. 
	The Select Visualization dialog box is 
	opened.
- Double-click Machine Load Summary, Machine Load In Standard Hours, 
	Machine Load, Shop Order Machine Load, Shop Order Labor Load, Shop Orders Material 
	Availability Summary or Shop Orders Material Availability.
- Select the bar/segment 
	representing the shop order(s) you want to schedule. Right-click and select 
	Schedule Shop Orders. The Schedule Shop 
	Order(s) dialog box is opened.
- Select Schedule Using Existing Shop Order 
	Settings if you want to base the scheduling on the existing Schedule 
	Direction, Earliest Start Date and Need Date of the shop 
	order(s).
- Select Forward Schedule From Earliest Start 
	Date and specify an earliest start date if you want to change 
	Schedule Direction to Forward Scheduling and schedule the shop 
	order(s) from this date.
- Click OK.