Set Preferred Resource
Explanation
Use this activity to allocate a specific work center resource to a shop order 
operation.
 
Prerequisites
N/A
System Effects
As a result of this activity, shop order operation will receive a new 
preferred resource and it will get scheduled on this resource given that it is available.
Window
Shop Order
Shop Order Operations
Related Window Descriptions
Shop Order
Shop Order/Operation
Shop Order 
Operations
Related Visualization Chart Descriptions
Shop Order Machine Load
Procedure
 
Shop Order, Shop 
Order Operations
	- In the 
	Preferred Resource 
	field, specify the work center resource which you want to allocate to the 
	operation. Use List of Values to select from the available resources.
- Save.
To set preferred resource using the 
visualization view:
	- Open a visualizer enabled window 
	and query for the site needed.
- If the Data View is displayed, click 
	Visualization View on the title bar. 
	
- Right-click and click 
	Select Visualization. 
	The 
	Select Visualization dialog box is 
	opened.
- Double-click 
	Shop Order Machine Load.
- Right-click and click 
	Y-Axis/Shop Order Operation.
- Select the inner 
	segment representing the shop order operation you want to set the preferred 
	resource for, right-click, point to 
	Set Preferred Resource
	and click 
	the resource you want to allocate to the operation.