Adjust and Verify Background Job for Recalculations of Post Maintenance 
Checks
Explanation
This activity is used to view calculated due dates for post maintenance check tasks. 
You can also use this activity to adjust the execution time of the background 
job (For more information, refer the online help file
Using Background Jobs). At installation, the server process for due 
calculations for post maintenance checks is set (by default) to execute each day at 8:00 P.M. The 
background job can also be executed manually for a specific post maintenance 
check.
Prerequisites
  - A modification or a fault must exist and have connections to valid post 
	maintenance checks.
- The modification must be complied with or the fault signed off.
System Effects
  - One or more post maintenance check tasks are created after the modification has been complied 
	with or after the fault has been repaired in accordance with the intervals set 
	on the post maintenance check definition.
- A pending task is created if the due date is within the forewarning limit.
Window
Serial Maintenance
Related Window Descriptions
Serial Maintenance
Serial Maintenance/Post Maint
Procedure
Follow this procedure to verify calculated tasks:
	- Open the Serial Maintenance window.
- Query (F3) for the serial for which you want to recalculate post 
	maintenance tasks.
- Right-click anywhere in the header of the window and then click 
	Perform Due Calculation to open the Perform Due Calculation 
	dialog box.
- Select the Post Maintenance Check check box. 
- If you want to perform the due calculations for all serials in the 
	serial structure, select the Calculate Entire Structure check box.
- To perform the due calculations as a background job, select the Run 
	in Background check box.
- Click OK.