Connect Level 0 Part to MS Set
Explanation
This activity is used to connect a master schedule level 0 part to a master scheduling
set and to enter data for cost and on-hand quantity information for all Level 0
part families. Master schedule set 1 is used for the actual master schedule;
others can be used for various forecasts and scenarios. The List of Values for
master schedule sets shows only those master schedule sets for which forecasts
have been entered for the site, and part numbers entered by the user.
Prerequisites
  - The master scheduling level 0 part has been registered
- The master schedule set has been defined.
System Effects
As a result of this activity, a master schedule level 0 part is connected to a selected
master schedule set.
Window
MS Basic Data
Related Window Descriptions
MS Basic Data
MS Basic Data/Family Set
Data
Procedure
  - Open the MS Basic Data window.
- Click the Family Set Data 
	tab. 
- Create a new record. 
- Specify the site for which you want to connect the part, 
	in the Site field. Use
    the List
    of Values to select a suitable value. 
- Specify the part family you want to connect to a master schedule set 
	in the Part No field.
    Use the List of Values to select a suitable value. The part
    description will automatically fill in.
- Specify which master schedule set you want to
    connect the selected part, in the Master Schedule Set field. Use the List of Values to select 
	a suitable value. 
- If the part is project connected, enter a value in 
	the PNG field. Use the List of Values to select a suitable value.
	
- Save the changes.