Evaluate Master Scheduling Level 0 Results
Explanation
This activity is used to evaluate the result of the master scheduling level 0
calculation which is performed when you aggregate item plans. 
Prerequisites
This activity requires that the aggregate item plans must have been
performed.
System Effects
N/A 
Window
MS Level 
0 Part
Related Window Descriptions
MS Level 0 Part
MS Level 0 Part/Register Forecast
Procedure
  - Open the 
	MS Level 
	0 Part window.
- Populate or search for the required part using the 
	Part No
	field. 
	If the required part is project master scheduled, 
	search for the part with the relevant PNG. 
- Click the 
	Register Forecast tab and study the result of the
    master scheduling level 0 calculation.