Evaluate Master Scheduling Level 1 Result
Explanation
This activity is used to evaluate the result of the master scheduling level 1 calculation. 
Prerequisites
This activity requires that the calculation of master scheduling level 1 must have been
performed.
System Effects
N/A
Window
MS Level 
1 Part
Related Window Descriptions
MS Level 1 Part
MS Level 1 Part/Register Forecast
Procedure
  - Open the MS Level 1 Part 
	window.
- Search for the part for which you want to study 
	the results. To search for project master scheduled parts, use the project PNG. 
- Click the 
	Register Forecast tab to display the result of the
    master scheduling level 1 calculation.