Recalculate Period Template for MS Graph 
Explanation
This activity is used to recalculate the period template for a cumulative or 
detailed MS graph. This
recalculation is necessary if the last run date of the selected level 0 or level 
1 part does
not match the begin date of the selected period template.  
Prerequisites
	- A level 0 or level 1 part must have been defined.
- A period template must exist in the Period Template Maintenance 
	window. 
System Effects
As a result of this activity, the system recalculates the selected period template's begin date to make it match
the level 1 part's last run date. This match is necessary for the system to 
perform the graph
calculations. 
Window
Cumulative MS Graph
Detailed MS Graph
Related Window Descriptions
Cumulative MS Graph
Detailed MS Graph
Recalculate Period Template
Procedure
  - Open the Cumulative MS Graph 
	or Detailed MS Graph window.
- Select Zero or One according to the part 
	level and populate the window.
- Enter a value in the Template ID field. Use the List of Values to 
	select a suitable value. 
- Right-click and click Recalculate Period Template. The 
	Recalculate Period Template dialog box
    is opened with the last run date of the part displayed in the Period 1 Begin Date field. 
	
- Click OK to recalculate the period template to use the
    part's last run date as the period template's begin date.