Define Vehicle Models
Explanation
This activity is used to enter vehicle requirements for the operational plan. 
Vehicle requirements are entered as items from which operational tasks will be 
generated. For each item you need to specify the number of vehicles required, 
the type of vehicle for which the plan is valid (based on the product and model 
specified), and the relevant planning dates. Further, you have the option of 
connecting additional equipment to an item if this equipment is needed for the 
plan.
At least one item must be specified on an operational plan before the plan 
can be completed. When the plan is completed, i.e., the Plan Complete 
check box is selected for the record, it will not be possible to enter, update 
or delete the operational items. Vehicle and personnel assignment can be done on 
the plan once it is completed.
Prerequisites
  - A product and model number needs to be defined. 
- To use equipment codes they must first be
    registered in the basic data.  
System Effects
  - Vehicle requirements are defined on the operational plan. 
- If specified, additional equipment requirements are connected to the 
	operational plan. 
- The operational plan can be completed and vehicle and personnel assigned 
	to the generated operational events.
Window
Operational
Planning
Related Window Descriptions
Operational Planning/Define Vehicle 
Models  
Operational Planning/General
Operational Planning  
Products and Models 
Serial Basic Data/Equipment Code 
Procedure
  - Open the 
	Operational Planning window.
- Populate (F2) or query (F3) for an existing operational plan and click the
    Define Vehicle Models tab.
- Create a new record (F5).
- In the Item Number field, enter the required item number. 
- In the Planned Start Date 
	field, enter the planned start date and time of the operational task 
	generated from this item. This value can be updated as long as the 
	operational plan is not completed. When you create a new item,
    the indicated start date cannot be earlier than the start date of the 
	operational plan. 
- In the 
  Planned Finish Date field, enter the planned completion date and time of 
	the operational task. This value can be updated as long as the operational 
	plan is not completed. When you create a new item, 
	the indicated finish date cannot be later than the finish date of the 
	operational plan.
-  In the Planned Value
    field, enter the planned operating time or length of the operational 
	task. 
 
- In the 
  Number of Vehicles field, enter the number of vehicles needed to complete 
	the operational task. This value can be updated
    as long as the operational plan is not completed.
- In the Product Number field, enter the product number of the 
	serials performing the operational task.
    Use the List of Values to select a
    suitable value.
- In the Model Number field, enter the model number of the 
	serials performing the operational task. Use the List of Values to select a suitable value.
-  Optionally, in the 
  Equipment Code field, enter the requested equipment assigned to serials 
	needed to perform the operational task. This value can be updated as long as 
	the operational plan is not completed. Use the List of Values to select a 
	suitable value.
- Save the information (F12).