Recalculate Fault Deferral
Explanation
This activity is used to recalculate the date a fault is performed after the 
deferral is approved.
Prerequisites
  - A fault with enabled fault deferral information must exist for a serial.
- The user must have access to the product model.
- The fault deferral must be approved.
- Fault deferral tasks that are in 
	a planning state (i.e., in the Planned in Scope, Incomplete or 
	Under Preparation status) must be connected to a maintenance order that 
	is not yet released.
System Effects
	- A new task date is calculated and the fault 
deferred.
- The recalculation for fault deferral tasks will handle tasks that are included on maintenance orders 
	not yet released. 
Window
Open Deferred Faults 
Serial Operational
Information 
Flight Log 
Related Window Descriptions
Open Deferred Faults 
Serial
Operational Information/Fault/Additional 
Flight Log 
Flight Log/Fault 
Deferral
Definition
Operations and Fault Basic Data/User Auth. Deferrals
Procedure
  - Open the  Open Deferred Faults 
    window and query (F3) for the necessary fault number. This is the fault for 
	which you want to approve the deferral. 
- Select the row, right-click, and then click Approve.
- Right-click on the row once more, and then click Serial Operational Information. The 
	 Serial Operational Information window is opened with information on the serial connected to the 
	fault.
- Click the Fault/Additional sub tab and select the 
	approved fault from the Fault Number list.
- Right-click and click Recalculate Deferral to perform the 
	calculation.
Follow this procedure to recalculate a fault deferral 
reported on a flight log:
	- Open the Flight Log 
	window and populate (F2) or query (F3) for your flight log number and/or serial.
- Click the Fault tab and select the relevant fault number from the 
	Fault Number list.
- Right-click and click Recalculate Deferral to perform the 
	calculation.