Enter Mandatory Route PM Information 
Explanation
Use this activity to enter mandatory information required to create a route PM action. 
Prerequisites
  - Information on equipment should be entered in IFS/Equipment.
- Information on linear assets should be entered in IFS/Linear Asset.
- Information on Actions should be entered in 
	Maintenance Basic Data.
- Information on maintenance organizations and employees should be entered
    in Organization Basic Data.
- Operational Status and Route IDs should be defined in  
	Work Order and PM Basic Data.
System Effects
As a result of this activity, a route PM action with a unique PM number will be created.
Window
Route PM Action
Related Window Descriptions
Route PM Action
Route PM Action/General
Procedure
  - Open Route PM Action  window and create a new record.
- Enter an appropriate revision in the Revision
    field. 
- In the Action field, select the PM action code for what has to be done.
- Select the 
	 General tab.
- Choose the appropriate Connection Type. 
- In the Object ID field, enter an object on which the PM action will 
	be performed. Use List of Values to select a suitable value or enter it 
	manually.
- In the Maint Org field, specify the responsible maintenance
    organization.
- In the Route ID field, select a suitable route definition.
- Save the information.