Generate PM Action
Explanation
This activity is used to create a new PM action from a
standard job. A separate standard job will generate a separate PM action, and a
route standard job will generate a route PM action.
Prerequisites
  - Equipment objects must have been registered in IFS/Equipment in order to 
	be selected on a record with Connection Type EQUIPMENT.
- Sites must have been registered and connected to the
    users in
    IFS/General Data for Inventory and Distribution.
- Actions, maintenance organizations, and route
    definitions must have been registered in IFS/Basic Data for Maintenance.
- The separate or route standard job should be active
    and valid.
System Effects
  - A PM action will be generated with all the information
    from the standard job. The new PM action will receive the Preliminary
    status.
- The standard job ID and revision will be connected
    to the 
	Jobs tab of the 
	Separate 
	PM Action or   
	Route
    PM Action window. 
Window
Separate
Standard Job 
Route Standard Job
Related Window Descriptions
Separate
Standard Job 
Route Standard Job
Create PM Action from Standard Job
Procedure
  - Open either the 
	Separate Standard Job
    window or the 
	Route Standard Job  window.
- Query for an active and
    valid standard job (F3).
- Right-click and then click Generate PM Action.
    The Create PM Action from Standard Job dialog box opens.
- Enter values in the Site, Object ID, Action,
    Route ID (only applicable for Route PM actions) and Maint Org
    fields. Click List to select suitable values.
- Click OK.