Generate Simulated PM Actions
Explanation
Use this activity to generate the simulated PM actions.
PM actions can be generated using one of the following methods:
  - You can generate a single PM action for each
    standard job, or
- You can generate a single PM action for a group of
    similar standard jobs. 
In addition, if there are any existing PM actions for
the selected object, you can manually select the PM action in which the standard job should
be included. For more information on how PM actions are generated, please
refer to the following online help
document:  Add Job Program to Object.  
Note: You cannot generate both separate and
route PM actions together. The generation procedure has to be executed
individually for each tab. 
Prerequisites
  - PM actions must have been simulated (applicable
    only when creating new PM actions).
- If you want to group the standard jobs, the Merge
    on PM check box must have been selected before simulation.
- PM actions must have been defined, and the status
    must have been set to
    Preliminary or Active in IFS/Preventive Maintenance if you want to connect
    (i.e., redirect) a standard job to an existing PM action.  
System Effects
  - The simulated PM actions will be generated. The
    temporary number will be replaced with the actual PM action
    number and displayed against the relevant standard job.  
- You can view the connected standard job on the 
	Separate PM Action/Jobs
    tab and the 
	Route PM Action/Jobs tab.
- For standard jobs that have a connection to job
    programs, values will appear in the Job Program ID and the Job Program Revision
    fields of the Separate PM Action/Jobs
    tab and the 
	Route PM Action/Jobs tab.  
Window
Add Job Program to Object
Related Window Descriptions
Add Job Program to Object 
Add Job Program to Object/Separate 
Add Job Program to Object/Route
Procedure
The steps below are applicable to both the
Separate and 
Route tabs of the 
Add Job Program 
to Object window.  
To generate new PM actions:
  - Open the  
	Add Job Program to Object window,
    and select a job program and an object.
- Define the default values
 and settings.
- Add separate and route standard jobs, and simulate
    the PM actions.
- Modify the revision of the PM action that is to be 
	generated (in the Revision field of the lower table) if
    necessary. 
- Save the information (F12). The change will be reflected
    in the upper table.
- Click Generate.
Note: If you enter a PM action revision where work orders have been 
created in step 4, you will be required to create a new revision for the PM 
action in the lower table. Simply enter a new revision ID and repeat steps 5 and 
6.
To connect (redirect) standard jobs to existing PM
actions:
  - Open the  
	Add Job Program to Object window,
    and select a job program and an object.
- Define the default values
    and settings.
- Add separate and route standard jobs.
- Select a standard job line, and enter the PM action
    ID, in the PM No
    field, to which you want to connect the standard job.
- Save the information (F12).
- Click Generate.