Manage Preliminary Reading
Explanation
This activity is 
used to
change a Preliminary reading into a valid reading, or to mark it as incorrect. 
An assistant will guide you through the process. The reading will have been set as a 
Preliminary Reading having failed validation, when entered against an Equipment 
Object Parameter in the Measurements for Object 
window. The assistant allows for the correction reason to be selected (Incorrect 
Reading/Meter Change/Meter Roll-over), and then provides for the relevant data 
to be entered for that reason. Provided that all the data has been entered, and 
the reading validates, then the Preliminary Reading will be converted to another 
Measurement Type. If more than one sequential reading exists of the type 
Preliminary Reading, only the earliest of these can be corrected via the 
assistant. 
Following correction, the subsequent readings will be re-validated, and will 
either be set as Recorded Readings, or if they still fail validation, will 
remain as Preliminary Readings - the earliest of which can then in turn be 
corrected.
Prerequisites
The parameter must be of Value Type ‘Accumulated’. ‘Limit’ type parameters are 
not affected by Meter Roll-overs and Meter Changes in the same way as 
Accumulated type parameters, as they do not have an accumulating Total Value.
System Effects
	- The Preliminary Reading will be converted to a different Measurement Type.
- If ‘Reading is incorrect’ is selected, the Preliminary Reading will be converted 
to an ‘Incorrect Reading’ - with the option to add an additional valid Recorded 
Reading as a replacement.
- If ‘Meter has rolled over’ is selected, the Preliminary Reading will be 
converted to a ‘Recorded Reading’ and a ‘Meter Rollover’ record will be 
inserted, at an earlier date to record the Rollover value.
- If ‘Meter has been changed’ is selected, the Preliminary Reading will be 
converted to a ‘Recorded Reading’ and two additional records will be inserted at 
an earlier date - ‘Before Meter Change’ and ‘After Meter Change’, recording the 
end value of the old meter, and the start value of the new meter.
Window
Measurements for Object 
Measurements
Related Window Descriptions
Measurements for Object 
Measurements 
Procedure
       
You can manage a preliminary reading from the 
Measurements for Object window, or the 
Measurements 
window. 
Managing a preliminary reading from the  Measurements for Object 
window:   
	- 
	
	Populate the 
	Measurements for Object window with an equipment object.
- 
	
	Select a parameter record
- 
	
	Identify a Preliminary reading in the Measurement History records, below the 
	parameter measurements. If there is more than one Preliminary record in a 
	sequence, select the earliest dated record.
- 
	
	Right-click, then click 
	Manage Preliminary Reading
- 
	
	An assistant appears, showing details of the object and parameter/meter 
	selected. Select one of the three options to manage the reading - Incorrect 
	reading/Meter roll-over/Meter change.
- 
	
	Proceed to the next step, the details of which depend upon the type of 
	correction selected.
- 
	
	For an Incorrect reading - enter the correct Recorded Value. The 
	Registration Date can be changed, if required, and a Measurement Note 
	can be added. The new value will be validated for the entered date. 
	If there is no replacement reading required or possible, select the 
	Correct Reading Unknown tick box. Click Finish once the data is 
	correct.
- 
	
	For a Meter roll-over - the current registered roll-over value for the meter 
	will be presented for checking (and changing if wrong), or if no value 
	exists, enter a value in the Meter Roll-over Value field.
- 
	
	Proceed to the final step, to review the data. The Meter Roll-over Value 
	will be used to create a new measurement record, and the Total Value 
	of the selected reading will be adjusted to include the roll-over value. 
	Click Finish if the data is correct.
- 
	
	For a Meter change - the details of the new meter need to be entered - the
	Start Value, the Meter Change Date, and where relevant the 
	Meter ID and Meter Roll-over value. The old meter End Value 
	should also be entered. If any of the Start Value/End Value/Meter Change 
	Date fields are unknown, the relevant tick boxes can be selected, resulting 
	in default values being entered. The End Value is defaulted to the 
	last known reading. The  Start Value is defaulted to zero. The
	Meter Change Date is defaulted to midway between the Selected 
	Registration Date and the last reading date. Click Finish once 
	the data is correct.
Managing a preliminary reading from the 
Measurements window:
	- 
	Populate the 
	Measurements window with an equipment 
object/parameter, sorted by registration date.
- 
	Identify a Preliminary reading in the 
	 
	Measurements records. If 
	there is more than one Preliminary record in a sequence, select the earliest 
	dated record.
- 
	Right-click, then click 
	 
	Manage Preliminary Reading
- 
	An 
	assistant appears, showing details of the object and parameter/meter 
	selected. Select one of the three options to manage the reading - Incorrect 
	reading/Meter roll-over/Meter change.
- 
	Proceed to the next step, the details of which depend upon the type of 
	correction selected
- For an Incorrect reading - enter the correct Recorded Value. The 
	Registration Date can be changed, if required, and a Measurement Note 
	can be added. The new value will be validated for the entered date. 
	If there is no replacement reading required or possible, select
 the Correct Reading Unknown tick box. Click Finish once the 
	data is correct
- 
	For a Meter roll-over - the current registered roll-over value for the meter 
	will be presented for checking (and changing if wrong), or if no value 
	exists, enter a value in the Meter Roll-over Value field.
- 
	Proceed to the final step, to review the data. The 
	Meter Roll-over Value 
	will be used to create a new measurement record, and the Total Value 
	of the selected reading will be adjusted to include the roll-over value. 
	Click Finish if the data is correct.
- 
	For a Meter change - the details of the new meter need to be entered - the
	Start Value, the Meter Change Date, and where relevant the 
	Meter ID and Meter Roll-over value. The old meter End Value 
	should also be entered. If any of the Start Value/End Value/Meter Change 
	Date fields are unknown, the relevant tick boxes can be selected, resulting 
	in default values being entered. The End Value is defaulted to the 
	last known reading. The  Start Value is defaulted to zero. The 
	Meter Change Date is defaulted to midway between the Selected 
	Registration Date and the last reading date. Click Finish once 
	the data is correct