Use this tab window to view the first level of the 
  structure of the specified project item. The structure can be modified by 
  using some of the available menu options in the tab window. 
If the parent is in
  status Realized, the new part must have been created in 
Project Product/Items 
  tab
  and set to status Realized before it can be connected to the realized parts
  structure. Status changes for the subpart can be done from the menu. 
You can transfer a
  list of parts to the 
Engineering Part Revision
window by
  selecting the menu option Engineering Part Revision. Other menu options 
  available to go directly to relevant window are Inventory Part,
  Inventory Availability Planning, Purchase Part, Product Structure, 
Part and Best Fit Search.
Create
  And Maintain Project Product Structure
Handle
  Project Delivery Changes 
Approve
  Project Product Structure
Define/Redefine
  Serial Numbers
Analyze
  Test Results
Complete
  Project Product Structure Information
Prepare
  Assembly
Enter Project Item
Build
      Project Delivery Structure
Delete
      Project Delivery Structure Branch
Change
      Project Product
Copy Standard
      Structure
Copy Project
      Item Structure
Replace Serial
Reserve Serial
      Number
Unreserve Serial
      Number
Set Serial
      Number
Reset Serial
      Number
Approve
      Project Product Design
Set
      Project Product Structure Realized
Redefine Project
      Item
Redesign
      Project Item
Reserve Inventory to Project
Issue from Inventory to Project Delivery
Unissue to Inventory from Project
Print
        Pick List
Change Inventory Part Location