Add Work Guideline to DOP Component / Operations 
Explanation
Use this activity to add work guidelines to a selected DOP component or an operation. 
Prerequisites
The DOP component must not be in the Closed or Canceled status. 
System Effects
As a result of this activity, the system adds work guidelines to a DOP component 
or an operation. Please note that if you add a work guideline to a released DOP 
it will not automatically replicated to the pegged shop order. 
Window
DOP Order,
DOP Header/Detail
DOP Header/Structure
DOP Order/ All Lover Levels
DOP Order/Components
DOP Header/Structure Multilevel
DOP Order/Operations
Related Window Descriptions
DOP Order,
DOP Header/Detail
DOP Header/Structure
DOP Order/All Lover Levels
DOP Order/Components
DOP Header/Structure Multilevel
DOP Order/Operations
Dop Component Work Guidelines
Dop Operation Work Guidelines
Select Work Guideline Template
Procedure
	- Select the DOP order or header to which you want to add work guidelines.
	
- Click Work Guideline from the right mouse button options.
- Click to create a new line in the table.
- To use an existing work guideline template, select the new line, right-click, 
	then click Work Guideline Template. Select a work guideline template, 
	then click OK.
- To create a work guideline manually, enter information in the Guideline 
	Desc and Guideline Text fields.
- Select a value in the Guideline Type field. For component work 
	guidelines valid values are Instruction and Reference. If you 
	choose Reference, you must enter values for the X Coordinate,
	Y Coordinate, Z Coordinate and Reference Qty fields. 
	For operation work guidelines valid values are Instruction and 
	Subtask. If you choose Subtask you can select Required in 
	the Sign Off Required field to prevent the operation from closing 
	before the subtask has been signed off. Select Required in the 
	Inspection Sign Off Required field to prevent the shop order from 
	closing before the subtask has been signed off.
- Repeat steps 3—5 for each work guideline to be connected to the specific 
	component or operation.
- Click Save.