Modify Manually within DOP Structure
Explanation
Use this activity to modify an existing DOP structure manually. It is possible to add or remove components or change
the quantity for a component. However, a status check must be done for pegged orders. 
Prerequisites
	- The DOP order and structure must have been created. 
- When a DOP order is released, a component may be 
	added or removed when the status of its supply shop orders is Planned, 
	Released, or Reserved.
- Pegged purchase orders must not exist.
- The quantity of a component may be changed if the 
	status of the supply shop orders matches or is lower than the status of the DOP Pegged SO Update field
      on the 
	DOP Order/Detail tab.
      
- The Allow changes to created DOP structure check box must be 
	selected to manually add or remove components to the structure.
      
 
System Effects
	- The Structure Changed check box on the 
	DOP Header/Detail 
	tab will be selected for the parent DOP order if a component DOP order is added 
	or deleted, or if the component DOP order's quantity per assembly is changed. 
	
-  When the DOP order is released, the 
	components and/or component quantities of its supply shop order will be adjusted.
- If you are changing the Qty Per Assembly value, the revised start date will be 
	recalculated depending on the revised due date, lead-time and the lead-time 
	offset, where the lead-time is depending on the new lot size and routing 
	revision and alternative.
- If the components to be removed are already reserved, then those 
	components will be unreserved. 
    
Window
DOP Header
Related Window Descriptions
DOP Header
DOP Header/Structure
DOP Header/Structure Multilevel
Procedure
  - Open the DOP Header window.
- Query for the ID of the DOP header for which you want to modify the structure and then click the 
	Structure
    tab.
- Make the required changes.
- Save your changes.