Perform Site MRP
Explanation
This activity is used to calculate the supply and demand for
material requirement planning (MRP)
parts based on shop orders, customer orders, etc. The system creates MRP-planned orders
for fulfilling these demands, such as purchase or shop order requisitions, and
offers suggestions to plan orders for optimal manufacturing, considering material
availability. 
The MRP process generates supply and demand for MRP parts generated in 
the following IFS modules: IFS/Customer Order, IFS/Customer Schedules, 
IFS/Supplier Schedules, IFS/MRP (for spare parts), IFS/Project, IFS/Project 
Delivery, IFS/Master Scheduling, IFS/Purchasing, IFS/Maintenance, IFS/DOP, 
IFS/Distribution Order, and IFS/Shop Order.
Prerequisites
	- BOMs must have been defined for the parts, and lead times for both
      the purchased and manufactured parts must have been
established. MRP only uses the existing product structure with the alternate " *
" indicated by an asterisk(*).  
- You must have created a master production schedule using IFS/Master Scheduling or 
	you should run PMRP. 
Note: MRP does not process parts with planning methods B 
- Order Point
Planning, C - Replenishment Level, M - Manufacturing Cell Part or N - Next Level Demand.  
System Effects
	- After this process is executed, the Warning or
      Error status can apply. Error indicates that some critical errors have occurred in the
process, and the MRP process has stopped. Warning indicates that a message posted
for this process has to be reviewed by the user. This can be done by using the View
Detail right mouse button option in the 
	Background Jobs window, which
	displays the message in the status information table. If the user
decides to continue the MRP process, the MRP process will display error messages when
the process is completed. 
- MRP calculation will consider inventory parts where the 
	MRP Control Flag check 
box in 
	Inventory Part/Manufacturing  tab  window is 
	selected. 
      
- MRP will generate shop order requisitions or non-firm production
schedules for parts that must be manufactured, and it will generate purchase requisitions or supplier schedules for parts that
must be purchased. 
- Shop order requisitions and purchase requisitions that are not converted into shop orders
      or non-firm production schedules are deleted the next time you start the MRP process. MRP calculates the
lowest level code of parts and updates the  Low Level field on the 
	Inventory
Part/Manufacturing tab. 
      
Window
Perform 
Site MRP
Related Window Descriptions
Perform 
Site MRP
Procedure
You can execute single-site MRP either by direct 
execution (Procedure A) or by scheduling the task to execute as a background job 
(Procedure B). 
Procedure A: 
  - Open the 
	Perform Site MRP window.
- In the  Site field, enter the site for which you want to run
    a single-site MRP. Click List
    to select from the available sites. If you leave the field blank, the MRP
    process is run for all the sites to
    which you have access.
- Select the date on which you want MRP to be
      executed. The current date is used by default. 
- If you want to stop the MRP process when an error occurs, 
	you can select the Stop MRP on error  check box.
- You can add 1-day lead-time back-off to planned 
	receipts, by selecting the Add 1-day lead-time backoff to planned
      receipts  check box.
- If you do not want to create messages for phantom 
	part dependant demands, you can select the Don't create messages for phantom 
	part dependant demand check box. 
- If you want the MRP process to 
	create safety stock replenishment orders on 
	the MRP run date, select the Planned Safety Stock 
	Receipt on MRP run Date check box. 
	If it is not selected, safety stock replenishment 
	orders will be created on the event date itself.
- If you want use an excess of alternate components to supply the demand of the primary components, instead of creating MRP planned supply, select the 
	Plan Alternate Component check box.
- Select the Run Integrated with CRP check box in order to use the CRP backward scheduling logic to schedule the shop order requisitions generated from the process.
- If the Run Integrated with CRP check box is selected, CRP backward scheduling logic will be used to schedule shop order requisitions generated from the process. As a result, the start date of the requisitions/receipts generated will be more accurate.
- If you want to get the default values defined by the administrator in the Database Tasks window, click Default.
- If you want to perform a selective MRP, click Selection and open Selective MRP Run Criteria dialog box. Selective MRP will enable you to run MRP for the selected set of parts from the site specified in step 2. 
	Use this dialog box to specify the selection criteria. You can use wild card characters in these fields. If you enter multiple selection criterias, parts that fulfill all the conditions will be selected to run the selective MRP.
- To run single site MRP, click OK.
Procedure B: 
Click Schedule to open the 
New Database Task Schedule window. Set the required scheduling parameters and save. Scheduled tasks can be seen in 
the Scheduled Database Tasks 
window