Perform MRP Network Report
Explanation
Use this activity to order a printout of the MRP results. The
report contains the system-generated proposals from the planning methods. If you do not
want to enter a specific selection criterion for the planning network, site, planner, or part number, enter
the percent sign (%). All output from the MRP sites, planners, or part numbers will be
displayed.
Prerequisites
The material requirements calculation must have been performed.
 
System Effects
As a result of this activity, the system creates an MRP report.
Window
Perform MRP Network Report
Related Window Descriptions
Perform MRP 
Network Report 
Procedure
  - Open the 
	Perform MRP 
	Network Report window.
- In the 
	Planning Network field, enter the network for which you want to 
	perform the MRP network report. Click the List button
    to select from the available planning networks. If you leave the field blank, MRP 
	network 
	report is run for all the planning networks to
    which you have access.
- In the Planner field, enter a specific 
	planner code for printouts. If you want to process all planners enter the
      percent sign (%) , or 
	leave the field blank.
- In the Commodity Group 2 field, enter a 
	specific commodity group code for printouts. If you want to process all 
	commodity groups, leave the field blank. 
- Enter the specific part number
      for which you want to 
	take printouts, in the Part No field. To process all the parts, enter
      the percent sign (%) or leave the field blank. 
- Select the appropriate part type from the
      list. 
- If you want to include the created orders, select
	Yes in the Show Orders Created filed. 
- If you want to include the changed orders in the 
	report, select Yes in the Show Orders Changed filed. 
	
- If you do not want to create messages for phantom 
	part dependant demand, you can select the Don't create messages for phantom 
	part dependant demand check box. 
- To execute
      the perform MRP 
	network report, click OK.