Propagate Date Upstream
Explanation
This activity is used to propagate dates upstream in a DOP structure.
The dates on lower levels in the DOP structure change with respect to the due date on the
DOP Order on which you perform the command and the lead time offset.
Prerequisites
This activity requires that the DOP Order has components. 
System Effects
As a result of this activity:
	- The revised due and start dates on
lower levels in the DOP structure are changed based on the revised due date of the DOP 
	Order, the lead time offset of the DOP Order, and the lead time of the component DOP 
	Order
part. 
- The lead-time is calculated due to the lot size and the routing revision and
alternative for the component DOP Order.
Window
DOP Header
DOP Order
Related Window Descriptions
DOP Header
DOP Header/Structure
DOP Header/Tree Structure
DOP Order
DOP Order/Detail
DOP Order/Tree Structure
Procedure
  - Select the DOP Order from where the upstream propagation of the
    date will start. 
- Right-click and point to 
	Propagate 
	Date/Quantity, then click Propagate Date Upstream. 
From the graphical object structure (DOP Order/Tree Structure or 
DOP
Header/DOP Structure): 
  - Select the DOP order from which to start an upstream propagation of
    dates.
- Right-click and point to Propagate Date/Quantity and then click 
	Propagate Date Upstream.