Activate Execution Logic Structure Template
Explanation
This activity is used to activate an execution logic structure (ELS) template. Once you have set up the correct execution logic 
sequence for performing the maintenance work you need to activate the ELS 
template. When the template is activated, the grouping ID can be connected to 
the maintenance order and used to create the execution logic structure (ELS) for 
the visit.
Prerequisites
	- A grouping ID in the Under Preparation 
	status must exist.
System Effects
	- If sorting is added to the grouping criteria but 
	has not been extended to the relevant ELS nodes in the template, this will 
	be done automatically when activating the template.
- Sorting numbers will be generated automatically 
	for ELS nodes lacking a sorting number. The auto-generated sorting number 
	will have a higher value than the sorting number which is manually entered, 
	and will be placed below nodes already sorted.
- The grouping ID is activated and the ELS template 
	can be connected to maintenance orders.
- The grouping criteria cannot be modified when the 
	ELS template is activated.
Window
Define 
Execution Logic Structure Template 
Related Window Descriptions
Define Execution Logic Structure 
Template 
Procedure
	- Open the Define Execution Logic Structure 
	Template window and query (F3) for the necessary grouping ID.
- Right-click on the header of the window, point to 
	Status, and then click Activate.
- A message appears requiring confirmation of the 
	step. Click Yes to activate the template.