Complete Grouping Criteria
Explanation
This activity is used to complete the grouping criteria. When you are finished with the definition of grouping criteria for a 
grouping ID, you need to perform this activity to retrieve basic data for the 
grouping criteria that will be used to build the Execution Logic Structure (ELS) 
template. Note: Only the basic data records with the Include in 
Execution Logic Planning check box selected will be considered. The 
generated structure can be viewed graphically in the Gantt 
tab or textually in the ELS Sequencing tab or the ELS Nodes 
tab.
Prerequisites
	- Grouping criteria must be defined for a grouping 
	ID and a product model.
- Basic data for execution phase, instruction 
	location, competence, zone and function number must be defined. The data to 
	be included in the ELS template must have the Include in Execution Logic 
	Planning check box selected.
System Effects
	- An ELS template with grouping nodes will be 
	generated for the grouping ID and product model. This can be viewed in the 
	Gantt chart or in a table format.
- A sorting can be added to all basic data valid for the selected grouping 
	criteria.
- If a sorting has been defined for execution phases in basic data, the 
	sorting will automatically be added to the template if the grouping 
	criterion for execution phases has been selected.
- The status of the grouping ID is set to Under 
	Preparation.
Window
Define 
Execution Logic Structure Template 
Related Window Descriptions
Define Execution Logic Structure 
Template 
Complete Grouping Criteria 
- Dialog Box 
Procedure
	- Open the Define Execution Logic Structure 
	Template window.
- Populate (F2) or query (F3) for the necessary 
	product model and/or grouping ID.
- Right-click, point to 
	Status, and then click Complete Grouping Criteria. The 
	Complete Grouping Criteria dialog box opens.
- Select the Generate ELS template in background check box if you 
	want to run the template generation as a background job. Note: You 
	may receive error messages if you start this as a background job, and then 
	choose to run it online before the background job has completed. Therefore, 
	it is recommended that you verify that the background job is completed 
	before you run the template generation online.
- Click OK.